WPP-47 / 2009-2011 ðâñž» ð Çñ åãðàðæ C üpàèvàªáv ÀæPÀn À ÁzÀÄzÀÄ ÀA ÀÄl 146 ÉAUÀ¼ÀÆgÀÄ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 (PÁwðÃPÀ 12, ±ÀPÀ ªÀµÀð 1933) ÀAaPÉ 43 sáuà - 1 gádå ÀPÁðgÀzÀ ªÀÄÄRå DzÉñÀUÀ¼ÀÄ ºÁUÀÆ ÀÄvÉÆÛÃ É ªÀÄÄAvÁzÀ J Áè E ÁSÉUÀ½UÀÆ ÀA A ü¹zà DzÉñÀUÀ¼ÀÄ Preamble: Sub : Read : WATER RESOURCES SECRETARIAT According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ Date 19-07-2011, from the Chief Engineer, Minor Irrigation North Zone, Bijapur. As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category states are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006, Karnataka state is classified as one of the nonspecial category states. 81 taluks in the state are approved under Drought prone Area Programme (DPAP). Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation. Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as state s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of the project District Taluka Estimated cost Potential planned (in Ha.) 1 Construction of Barrage across Tuppari Nalla near Singanhalli village 2 Construction of Bridge cum Barrage across Halla near Doni village 3 Construction of Bandhara across Hire Halla near Petalur (Site No.1) village 4 Construction of Bridge cum Barrage across Halla near Ankli village (3001) Cost per Ha. (Rs. In Lakhs) Dharwad Dharwad 133.00 90 1.47 Gadag Mundaragi 95.00 66 1.44 Gadag Mundaragi 50.00 51 0.98 Gadag Shirahatti 167.00 113 1.48 Total 445.00
3002 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 Government Order No. SANEEYEE 12 MASAVI 2011 (23) (tech) Bangalore, Dated 11 th August 2011 In view of the above, the Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 445.00 lakhs (Rupees Four hundred and fourty five lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken-up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Government and State Government. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O & M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009 dated 09-12-2009. P.R.2051 By order and in the name of the Governor of Karnataka, RUDRAMURTHY Ex officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read : Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ Date 19-07-2011, from the Chief Engineer, Minor Irrigation North Zone, Bijapur. Preamble: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category states are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006, Karnataka state is classified as one of the nonspecial category states. 81 taluks in the state are approved under Drought prone Area Programme (DPAP). Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation. Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as state s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Sl. Name of the project District Taluka Estimated cost Potential Cost per No. planned (in Ha.) Ha. (Rs. In Lakhs) 1 Construction of Bridge cum Belgaum Belgaum 100.00 55 1.82 Barrage across Nalla near Handignur. 2 Construction of Bridge cum Belgaum Ramdurga 190.00 100 1.9 Barrage across Malaprabha river near Sangal village. 3 Construction of Bridge cum Belgaum Gokak 190.00 110 1.73 Barrage across kanvihalla near Upparhatti village (Site-2). Total 480.00
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3003 Government Order No. SANEEYEE 12 MASAVI 2011 (17) (tech) Bangalore, Dated 11 th August 2011 In view of the above, Administratifve approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 480.00 lakhs (Rupees Four hundred and eighty lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken-up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Government and State Government. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O & M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009 dated 09-12-2009. P.R.2052 By Order and in the name of the Governor of Karnataka, RUDRAMURTHY Ex-officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read : Letter No. CEMI(S)/TA-2/AE-2/AIBP/2010-11/2538/dated 04-07-2011, from the Chief Engineer, Minor Irrigation South Zone, Bangalore. Preamble: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought prone Area Programme (DPAP) Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified new Minor irrigation Schemes in these taluks for seeking Government of India approval under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation South Zone in the letter read above has requested for according administrative approval to the estimate of the works proposed under AIBP. Accordingly the following scheme in DPAP taluk is being considered for according administrative approval. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Sl. Potential Cost per Ha. No Name of the Project District Taluk Estimated cost planned in Rs. In Lakhs. Ha. 1 2 3 4 5 6 7 Construction of New Tank across 1 Kedigehalla near Doddakodihalli Village Hassan Belur 140.00 108.00 1.30 under Doddakodihalli GP Construction of Pickup and canal near Chickmagal 2 Kadur 277.00 150.00 1.85 Nidaghatta ur Total 417.00
3004 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 Government Order No. SANEEYEE 12 MASAVI (Tech) 2011 (9), Bangalore, dated 11-08-2011 In view of the above, the Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 417.00 lakhs (Rupees four hundred and seventeen lakhs only) subject to the following conditions. P.R. 2053 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009, dated 09-12-2009. By Order and in the name of the Governor of Karnataka Rudramurthy Ex-officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Read : Programme-Regarding. Letter No. CE/MI(N) Zone/BJP/AIBP/PB-3/2011-12/3864/dated 19-07-2011, from the Chief Engineer, Minor Irrigation North Zone, Bijapur. Preamble: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought prone Area Programme (DPAP). Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Sl. No. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Name of the Project District Taluk Estimated cost Potential planned in Ha. Cost per Ha. (Rs. In Lakhs) 1 2 3 4 5 6 7 1 Construction of Bandhara across Halla near Varur village Dharwad Hubli 65.00 54 1.2 2 Construction of Bandhara across Halla near Kuradakeri village, Site No. 2 Dharwad Hubli 60.00 51 1.18 3 Construction of Bandhara across Halla near Virapur village, Dharwad Hubli 60.00 55 1.09 4 Construction of Bandhara across Local nalla near Nulvi, Site No. 2 village, Dharwad Hubli 43.00 56 0.86 5 Construction of Bandhara across Karki nalla near Mishrikotti village Dharwad Kalaghatagi 75.00 58 1.29 6 Construction of Barrage across Bedthi nalla near Dhulikoppa village Dharwad Kalaghatagi 100.00 51 1.96 7 Construction of Bandhara across Shiralajhalla near Muttagi village Dharwad Kalaghatagi 50.00 51 0.98 Total 453.00
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3005 Government Order No. SANEEYEE 12 MASAVI 2011 (20) (tech), Bangalore, dated 11-08-2011 In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 453.00 lakhs (Rupees four hundred and fifty three lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009, dated 09-12-2009. P.R. 2054 By Order and in the name of the Governor of Karnataka Rudramurthy Ex officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read : Letter No. CE/MI(N) ZONE/BJP/AIBP/PB-3/2011-12/3864/dated 19-07-2011, from the Chief Engineer, Minor Irrigation North Zone, Bijapur. Preamble: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought prone Area Programme (DPAP), Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Potential Sl. Cost per Ha. Name of the Project District Taluk Estimated cost planned in No. (Rs. In Lakhs) Ha. 1 2 3 4 5 6 7 Construction of Bridge cum Barrage in 1 between Rottigawada and Mulagunda Dharwad Kundagol 150.00 76 1.97 Village Construction of Barrage near Kamadolli 2 Dharwad Kundagol 150.00 76 1.97 Village in Kundagol Construction of Barrage across Gogi 3 Dharwad Kundagol 170.00 86 1.98 Nala near Hosalli Village Total 470.00 Government Order No. SANEEYEE 12 MASAVI 2011 (18) (tech), Bangalore, dated 11-08-2011 In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 470.00 lakhs (Rupees four hundred and seventy lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI.
3006 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 P.R. 2055 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009, dated 09-12-2009. By Order and in the name of the Governor of Karnataka Rudramurthy Ex-officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read : Letter No. CEMI(S)/TA-2/AE-2/AIBP/2010-11/2538/dated 04-07-2011, from the Chief Engineer, Minor Irrigation South Zone, Bangalore. Preamble: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought prone Area Programme (DPAP), Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified new Minor irrigation Schemes in these taluks for seeking Government of India approval under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation South Zone in the letter read above has requested for according administrative approval to the estimate of the works proposed under AIBP. Accordingly the following scheme in DPAP taluk is being considered for according administrative approval. Sl. No. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Name of the Project District Taluk Estimated cost Potential planned in Ha. Cost per Ha. (Rs. In Lakhs) 1 2 3 4 5 6 7 1 Construction of barrage across chinnahagari halla near Chitradurga Molakalmur 310.00 170.00 1.82 chikkobanahalli village 2 Construction of Percolation tank near Chikkarakere Davanagere Jagalur 150.85 80.00 1.89 Total 460.85 Government Order No. SANEEYEE 12 MASAVI (Tech) 2011 (7), Bangalore, dated 11-08-2011 In view of the above, the Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 460.85 lakhs (Rupees Four hundred sixty lakhs eighty five thousand only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs.
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3007 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009, dated 09-12-2009. P.R. 2056 By Order and in the name of the Governor of Karnataka Rudramurthy Ex-officio Under Secretary to Government Water Resources Department (Minor Irrigation) Preamble: WATER RESOURCES SECRETARIAT Sub : According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Read : Programme-Regarding. Letter No. CEMI(S)/TA-2/AE-2/AIBP/2010-11/2538/dated 04-07-2011, from the Chief Engineer, Minor Irrigation South Zone, Bangalore. As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought prone Area Programme (DPAP), Hence Minor Irrigation schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified new Minor irrigation Schemes in these taluks for seeking Government of India approval under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation South Zone in the letter read above has requested for according administrative approval to the estimate of the works proposed under AIBP. Accordingly the following scheme in DPAP taluk is being considered for according administrative approval. Sl. No. Head of Account: 4702-00-101-1-10-139 AIBP Major Works Name of the Project District Taluk Estimated cost Potential planned in 1 2 3 4 5 6 7 1 Construction of barrage across chinnahagari halla near hirekeranahalli village Construction of Check dam Across Ha. Cost per Ha. (Rs. In Lakhs) Chitradurga Molakalmur 420.00 220.00 1.91 2 Hireholegere halla near Bailgadde village, Shannovalli G.P. Chikkamagalur Koppa 73.00 62.00 1.18 Total 493.00 Government Order No. SANEEYEE 12 MASAVI (Tech) 2011 (8), Bangalore, dated 11-08-2011 In view of the above, the Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 490.00 Lakhs (Rupees Four hundred and ninty three lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs.
3008 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009, dated 09-12-2009. P.R. 2057 By Order and in the name of the Governor of Karnataka Rudramurthy Ex-officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub: According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read: Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ dated : 19-07-2011 from the Chief Engineer, Minor Irrigation North Zone, Bijapur. PREAMBLE: As per the modified guidelines issued by the Government of India, Minor Irrigation schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are elilgible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account : 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of Project District Taluka Estimated cost Potential planned (in Ha.) Cost per Ha. (Rs. in Lakhs) 1 Construction of Bandhara across Gadag Gadag 50.00 51 0.98 Gaddihalla near Betageri village. 2 Construction of Barrage cum Bridge near Bidar Humnabad 190.00 105 1.8 village Kandgul. 3 Construction of Barrage cum Bridge near Bidar Humnabad 192.00 100 1.92 village Madgul Tq. Humnabad Dist. Bidar. Total 432.00 GOVERNMENT ORDER NO. SANEEYEE 12 MASAVI 2011 (28) (TECH), BANGALORE, DATED: 11-08-2011. In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 432.00 lakhs (Rupees four hundred and thirty two lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed within a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State. Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP Act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI.
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3009 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This Order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009 dated 09-12-2009. By Order and in the name of the Governor of Karnataka RUDRAMURTHY PR No. 2058 EX Officio Under Secretary to Government Water Resources Department.(Minor Irrigation) WATER RESOURCES SECRETARIAT Sub: According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read: Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ dated : 19-07-2011 from the Chief Engineer, Minor Irrigation North Zone, Bijapur. PREAMBLE: As per the modified guidelines issued by the Government of India, Minor Irrigation Schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account : 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of Project District Taluka Estimated cost Potential planned (in Ha.) Cost per Ha. (Rs. in Lakhs) 1 Construction of Bridge cum Barrage across Hire Gadag Mundaragi 175.00 116 1.51 Halla in between Bardur & Kalkere village. 2 Construction of Bandhara across Kallahalla Gadag Shirahatti 50.00 50 1 near Gojanur village. 3 Construction of Barrage across Halla near Gadag Shirahatti 170.00 115 1.48 Choudalu village Total 395.00 GOVERNMENT ORDER NO. SANEEYEE 12 MASAVI 2011 (24) (TECH), BANGALORE, DATED: 11-08-2011. In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 395.00 lakhs (Rupees Three hundred and ninty five lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI.
3010 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009 dated : 09-12-2009. By Order and in the name of the Governor of Karnataka RUDRAMURTHY PR No. 2059 Ex-Officio Under Secretary to Government Water Resources Department. (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub: According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read: Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ dated : 19-07-2011 from the Chief Engineer, Minor Irrigation North Zone, Bijapur. PREAMBLE: As per the modified guidelines issued by the Government of India, Minor Irrigation Schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account : 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of Project District Taluka Estimated cost Potential planned (in Ha.) Cost per Ha. (Rs. in Lakhs) 1 Construction of Bandhara near village Bidar Humnabad 75.00 52 1.44 Belkera. 2 Construction of Barrage cum Bridge near Gulbarga Jewargi 180.00 96 1.88 Harwal. 3 Construction of Anicut near Kinni Tanda Gulbarga Gulbarga 100.00 70 1.43 in Gulbarga. 4 Construction of Anicut near Kawanalli Gulbarga Gulbarga 125.00 97 1.288 Tanda. Total 480.00 GOVERNMENT ORDER NO. SANEEYEE 12 MASAVI 2011 (25) (TECH), BANGALORE, DATED: 11-08-2011. In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 480.00 lakhs (Rupees Four hundred and eighty lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act.
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3011 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009 dated : 09-12-2009. By Order and in the name of the Governor of Karnataka RUDRAMURTHY PR No. 2060 Ex-Officio Under Secretary to Government Water Resources Department (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub: According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read: Letter No. CEMI (S) TA-2/AE-2/AIBP/2010-11/2538/ dated : 04-07-2011 from the Chief Engineer, Minor Irrigation South Zone, Bijapur. PREAMBLE: As per the modified guidelines issued by the Government of India, Minor Irrigation Schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified new Minor Irrigation Schemes in these taluks for seeking Government of India approval under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation South Zone, in the letter read above has requested for according administrative approval to the estimate of the works proposed under AIBP. Accordingly the following scheme in DPAP taluk is being considered for according administrative approval. Head of Account : 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of the Project District Taluka Estimated cost Potential planned (in Ha.) Cost per Ha. (Rs. in Lakhs) 1 Construction of Kasaba Anicut Chickmagalur Kadur 150.00 95.00 1.58 Channel (4.00 to 6.50 km). 2 Construction of Gajare Anicut Chickmagalur Kadur 290.00 185.00 1.57 Channel. Total 440.00 GOVERNMENT ORDER NO. SANEEYEE 12 MASAVI (TECH), 2011 (12) BANGALORE, DATED: 11-08-2011. In view of the above, the Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 440.00 lakhs (Rupees Four hundred and forty lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI.
3012 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 sáuà-1 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in their note No. PWD-890-FC-1/2009 dated : 09-12-2009. By Order and in the name of the Governor of Karnataka RUDRAMURTHY PR No. 2061 Ex-Officio Under Secretary to Government Water Resources Department. (Minor Irrigation) WATER RESOURCES SECRETARIAT Sub: According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Read: Letter No. CE/MI (N) Zone/BJP/AIBP/PB-3/2011-12/3864/ dated : 19-07-2011 from the Chief Engineer, Minor Irrigation North Zone, Bijapur. PREAMBLE: As per the modified guidelines issued by the Government of India, Minor Irrigation Schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the non-special category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified the new Minor Irrigation Schemes in these taluks to seek approval of Government of India under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation North Zone, Bijapur in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Head of Account : 4702-00-101-1-10-139 AIBP Major Works Sl. No. Name of Project District Taluka Estimated cost Potential planned (in Ha.) Cost per Ha. (Rs. in Lakhs) 1 Construction of Bridge cum Barrage Belgaum Belgaum 90.00 55 1.64 across Markandeya river near Kallehole in Belgaum Taluka, Belgaum Dist. 2 Construction of Bridge cum Barrage in Dharwad Hubli 160.00 81 1.98 between Umachagi and Yaraguppa village. 3 Construction Bridge cum Barrage across Dharwad Hubli 139.00 79 1.76 Yarnahalla near Koliwad-Bhadrapur Road. 4 Construction of Bandhara across Local Dharwad Hubli 65.00 59 1.1 nala near Timmasagar village. Total 454.00 GOVERNMENT ORDER NO. SANEEYEE 12 MASAVI 2011 (19) (TECH), BANGALORE, DATED: 11-08-2011. In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 454.00 lakhs (Rupees Four hundred and fifty four lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act.
sáuà-1 PÀ ÁðlPÀ gádå ÀvÀæ, UÀÄgÀĪÁgÀ, ÀªÉA gï 3, 2011 3013 PR No. 2062 PREAMBLE: 6. The implementation of the project shall adhere to the terms and conditions of the guidelines issued by the GOI. 7. The implementation of the project shall be as per the required technical specifications and financial specifications as per the approved DPRs. 8. Water users association shall be formed for post construction maintenance and the scheme shall be handed over to the same after its construction for the O&M. This order is issued with the concurrence of Finance Department in note No. PWD-890-FC-1/2009 dated : 09-12-2009. Sub: Read: By Order and in the name of the Governor of Karnataka RUDRAMURTHY Ex-Officio Under Secretary to Government Water Resources Department. (Minor Irrigation) WATER RESOURCES SECRETARIAT According Administrative Approval to the Minor Irrigation Projects under Accelerated Irrigation Benefit Programme-Regarding. Letter No. CEMI(S)/TA-2/AE-2/AIBP/2010-11/2538/dt. 04-07-2011 from the Chief Engineer, Minor Irrigation South Zone, Bangalore. As per the modified guidelines issued by the Government of India, Minor Irrigation Schemes with potential more than 50 hectares which serve tribal areas and drought prone areas in the non-special category States are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP) effective from December 2006. Karnataka State is classified as one of the nonspecial category States. 81 taluks in the State are approved under Drought Prone Area Programme (DPAP). Hence Minor Irrigation Schemes with potential more than 50 hectares in these 81 taluks are eligible for inclusion under Accelerated Irrigation Benefit Programme (AIBP). Central Assistance will be in the form of central grant that will be 90% of the balance estimated cost of the project worked after excluding the previous expenditure and considering the cost of the schemes upto Rs. 1.5 lakh per Ha. The balance cost of the project will have to be borne by the State as State s share. Government of Karnataka has identified new Minor Irrigation Schemes in these taluks for seeking Government of India approval under AIBP. Finance Department, Government of Karnataka has also approved the proposal of the Water Resources Department (Minor Irrigation) for according approval to such schemes. The Chief Engineer, Minor Irrigation South Zone, in the letter read above has requested for according administrative approval to the estimates of the works proposed under AIBP. Accordingly the following schemes in DPAP taluks are being considered for according administrative approval. Sl. No. 1 2 Head of Account : 4702-00-101-1-10-139 AIBP Major Works Name of Project District Taluk Construction of Beekanahalli Hirekere Feeder Channel Construction of Mugalavalli Channel. Estimated cost Potential planned (in Ha.) Cost per Ha. Rs. in Lakhs Chickmagalur Chickmagalur 80.00 65.00 1.23 Chickmagalur Chickmagalur 400.00 Total 480.00 210.00 Government Order No. SANEEYEE 12 MASAVI (Tech), 2011 (10) Bangalore, Dated: 11-08-2011. In view of the above, Administrative approval is hereby accorded for taking up the above works with an estimated cost totaling to Rs. 480.00 lakhs (Rupees Four hundred and eighty lakhs only) subject to the following conditions. 1. Implementation of these projects should be taken up only after receipt of necessary approval from the GOI. 2. The projects are to be completed with in a period of 2 years after receipt of approval of Government of India to these schemes. 3. The funding of the scheme is in the ratio of 90:10 between the Central Govt. and State Govt. 4. The Central share is in the form of grant to the State. 5. The projects will be implemented by the Water Resources Department (Minor Irrigation) as per the KTPP act. 1.90